Industrial Plant and Construction Works

Our company completes and delivers the project-related construction, mechanical and electrical-automation works of industrial facilities as turnkey. It performs the reinforced concrete and steel construction works required to be done in the facility depending on the process, the production of process-specific machines in its factory, the procurement of process-specific devices to be procured from abroad, the assembly of the engine and system in the field, the process piping and the electrical automation of the system.

ETİ MINING ENTERPRISES BANDIRMA BORON MANAGEMENT
Project: Manufacturing of 3 Boric Acid Solution Pressure Filters and delivering them in working condition
Scope:

  • Projecting and manufacturing of 3 pressure filter systems
  • Necessary disassembly and construction work in the area where the filters will be mounted in the facility
  • Boric Acid and Borax Solution special valves, pumps, etc. other armatures to be supplied from abroad.
  • Installation of filters
  • Making process-specific stainless pipelines
  • Establishment of the Electric-Automation system
  • Establishment of unique heat trace system for required isolation and filters
  • Commissioning of filters

 

 

ETİ MINING ENTERPRISES KIRKA BORON FACILITY
Project: Construction of Fluid Bed Drying Unit and disassembly of the old unit
Scope:

  • Dismantling of the old rotary drying system of Penta1 Factory
  • Special steel composite reinforced concrete construction for the assembly of Comessa brand dryers and outbuildings
  • Installation of Comessa brand dryers
  • Installation of heaters, cyclones, fans, scrubbers and other auxiliary equipment of dryers
  • Manufacture and installation of process piping
  • Testing the system in working condition
  • During the construction of this system, the old system was backed up, and the factory’s production was not stopped during the operation.

 

 

ETİ MINING ENTERPRISES KIRKA BORON FACILITY
Project: Penta2 Solving Gutter Factory Decanter Centrifuge Platform Construction and Decanter Centrifuge Installation
Scope: –

  • Disassembly of machinery and equipment in the area where the platform will be built in the unwinding chute building
  • Reinforced concrete foundation construction, steel construction and installation of the platform
  • 1 Belt Conveyor Manufacturing and Installation
  • Installation of Alfa Laval Brand Decanter Centrifuges

 

 

ETİ MINING ENTERPRISES KIRKA BORON FACILITY
Project: Installing inner liner container filling system in Building C of Penta 4 and Penta 5 factories
Scope: –

  • To fill 20-foot standard containers in bulk up to 28 tons, the design and manufacture of 2 container loading machines with an automatic weighing system can take the boxes from the truck to 90 degrees and open and close their lids.
  • Manufacture and supply of Belt Conveyors, manual and pneumatic sliding flap systems required to receive the goods from storage silos in the system
  • Establishment of an electrical-automation system that enables the desired amount of filling from the desired silo of the system
  • Construction of an exceptional suspended steel construction porch with tension from the existing building in the filling area
  • Operating the system and performing performance tests
  • Giving the necessary training and orientation studies to the operating personnel
  • Delivery of the system to operation